Tape comparison guide

Scotch 23 vs 2220: Main Insulation or Stress Control?

Compare before sourcing

Construction, purpose, and documented performance

Scotch 23 is linered EPR for main insulation; 2220 is stress-control mastic for terminations. Compare build, use and voltage class, then pick the right one.

Selection pointScotch Rubber Splicing Tape 23Scotch 2220 Electrical Stress Control Tape
Product typeSelf-fusing rubber splicing tapeElectrical stress control tape
BackingEthylene propylene rubberStress-control compound
Typical usesCable-joint insulation, Moisture-sealed splice build-upMedium-voltage cable joints, Cable terminations and stress control
SourceManufacturer dataManufacturer data

Choosing between main-insulation Scotch 23 and stress-control Scotch 2220

These are two different layers of the same joint, not two versions of one tape. Scotch 23 is a linered EPR rubber splicing tape that builds the primary insulation wall of a cable joint or termination, while Scotch 2220 is a stress-control mastic applied at the cable shield cut-back to manage the electric field where shielding is removed. One insulates, the other controls the field, and a joint that needs both uses both, in their own layers.

Scotch 23 carries the insulation numbers: 30 mil (0.76 mm) EPR tape, documented by 3M for primary insulation of solid dielectric cables rated through 69 kV, rated for continuous service to 90°C. It is supplied on a removable liner that is stripped off as the tape is applied, and it self-fuses into a continuous void-free insulation layer. Scotch 2220 carries no insulation rating of its own — do not size it as insulation, and do not expect it to replace the splicing tape in the build-up.

Build and handling follow the job each one does. Tape 23 is wrapped with half overlap and bonds to itself as it is stretched onto the joint, so the insulation wall is built up layer by layer to the thickness the design calls for. Tape 2220 is a mouldable compound pressed and shaped by hand around the shield cut-back, where it smooths the field concentration at the edge of the shielding before the insulation is built over it. Both are commonly finished with a suitable vinyl overwrap where added mechanical and environmental protection is required.

Match the layers to the joint design, not to the shelf. Start from the cable system, the voltage class, the joint or termination design and the applicable 3M installation procedure, then agree the build-up, the roll widths and the quantities for the complete joint before requesting a quotation.

What to check before changing tape

  • Cable system, voltage class, and whether the job is a splice, a termination or a repair
  • Which layer is needed: primary insulation (Scotch 23), stress control at the shield cut-back (2220), or both
  • Scotch 23 ratings: 30 mil (0.76 mm) linered EPR, primary insulation through 69 kV, 90°C continuous service
  • Liner handling: Scotch 23 is supplied on a removable liner stripped off during application — confirm the current data sheet before specifying
  • The applicable 3M installation procedure, the full build-up, roll widths, quantities and destination
Browse high voltage splicing tape models